How to prepare a floor for peel stick tile.
Floor prep for ceramic tile on concrete.
Multiply length times width of the room.
Inspect the floor and repair cracks pits holes or other uneven patches.
Use concrete filler or a similar floor patching compound to repair the damage.
Additionally a steps must be taken to ensure that a concrete floor will create a solid bond.
How to prepare concrete floor for ceramic tile.
Add about 10 to that number to account for any possible mistakes and warped boards.
If you re going to install tiles in wet areas such as bathrooms and balconies you need to apply a waterproofing membrane or paint first.
Most floor tiles made from the 1920s to the 1960s contain asbestos and require special procedures for removal.
To prepare your concrete subfloor make sure that it can accept water penetration.
If you re unsure about yours remove a tile and send it to a local asbestos abatement firm for testing.
As with a wooden subfloor a concrete subfloor must be level for successful tile installation.
If you discovered any defects on the floor fill them with a concrete patch or self leveling compound to achieve a flat surface that s ready to receive ceramic tiles.
Seal off the area with poly sheeting.
Self leveling compound can be purchased at your local home improvement store.
However laying vinyl flooring over concrete requires a bit more preparation.
After all cracks and uneven areas in the concrete can cause damage to the tile above and uncontrolled moisture in the concrete can destroy the mortar and loosen the tiles.
When you take time to prepare the concrete floor you ll have a better chance of creating an even tile design that looks great and is built to last.
Leave the vinyl in place for 72 hours.
Prepare the subfloor repair cracks and holes.
A concrete floor is a good base for laying ceramic tiles provided it is level and free of cracks or abrasions.
Tape a 3 foot square piece of scrap vinyl to the concrete with duct tape sealing the edges tight.
Installing ceramic tiles over concrete can help to create a more inviting indoor or outdoor living space.
Using an acid based cleaner or deep cleaner of your choice clean the concrete and allow it to dry thoroughly.
Determine how much flooring and materials will be needed.
If it tests positive follow these asbestos abatement procedures.
Remove any carpet or other flooring.
Peel and stick tile has come a long way since the days when it was a cheap and easy if not very attractive way to give old floors new life.