Multiply length times width of the room.
Floor preparation for real hardwood.
They re just made differently.
If you have any squeaky areas before the hardwood is installed take care of it before it s too late.
Here s what you need to know to prepare a wood sub floor to make sure it is problem free and has a long and beautiful life.
Add about 10 to that number to account for any possible mistakes and warped boards.
If you have a vinyl floor you may be able to install your flooring directly on top of it.
The quality of your floor depends a great deal on the integrity of your sub floor.
Determine how much flooring and materials will be needed.
Scrape the floor clean of drywall compound paint and other substances on the floor.
The layers typically include a top veneer of hardwood backed by less expensive layers of plywood although some.
Shim areas increase vertical height.
About the floor prep before i continue.
Continue this process on the floor along the wall.
If you have one a dead blow hammer will remove the need for a kick tool or wood block to serve as padding.
But you may want to supplement their dust control efforts.
If the surface has been finished.
Often plywood will loosen from the floor joists over time.
Decking screws work the best to keep both tight against one another.
Place the flat edge of a kick tool or wood block against the end of the second piece and hit the kicker with a hammer.
Before you install your plywood subfloor first calculate the room s square footage to find out how much flooring you ll need to buy.
Keep in mind steam water vinegar and cleaners like murphy s oil soap that produces suds should never be used to clean wood floors.
Do this by multiplying the room s length by its width.
Most wood floor installers will take basic preparations to contain the dust.
Snap the two tongue and groove pieces of flooring together.
If the wood flooring is to be glued down make sure there aren t sealers or other coatings that may interfere with the adhesive bond.
The key to a beautiful long lasting hardwood or laminate floor is a well prepared subfloor.
Make sure they re snug.
Method squirt and mop and bona hardwood floor cleaner are two good ones.
Painting wood stairs and floors requires the same preparation as for any interior paint job.
Dust is the number one problem for homeowners during wood flooring installation.
We avoid those problems by using a buffer and hard plate with 30 grit sandpaper to abrade the surface.
You re still getting real hardwood floors.
Seal off rooms that will not be sanded.
Remove any carpet or other flooring.
Hardwood floors in high traffic areas in your home may require a deep cleaning by a flooring professional.